Main text
Movies
Please take a look at our corporate showreel and footage of some of our projects.
List of movies
First Floating Float-Over Vyborg
Dockwise Group was responsible for laying out and installing the mooring spread, subcontracting, engineering and the execution of the floating-float-over. In short, total logistical project management.
Interview with Dockwise CCO, Martin Adler
Dockwise CCO, Martin Adler, interviewed by Fred Thompson of Inside Business.
Reinstatement of the MS3
August 2009: The fully renewed and reinstated Mighty Servant 3 has rejoined the fleet of Dockwise. The vessel has been under repair at the Grand Bahama Shipyard since January, 2008.
CPOC Float-Over Installation
Dockwise successfully performed the complete transport and float-over installation of 19,000 tonne (20,944 s.ton) MDPP offshore production platform for CPOC.
Two Nuclear Powered Submarines On Board One Vessel
On June 30th 2009, Dockwise assisted the Russian Federation with the decommissioning of two “Viktor III – Class” nuclear powered submarines.
Dockwise presents: Dockwise
Dockwise is an Oil & Gas Service Provider who serves global clients with logistical management of large and heavy structures.
First Floating Float-Over Vyborg
Dockwise completed the two float-overs for the Vyborg Project in Korea. The Vyborg Project is big in scope and size: It involves moving two 15,000 metric ton semi-submersible hulls and two topsides that weigh approximately 19,000 metric tons each.
Assistance text
For additional media assistance, please contact our Media & Promotion Manager at communication@dockwise.com or T: +31 (0)76 548 41 00