Main text
Project Archive
If you want to receive more information about one of our previous projects, please click the link to send us an e-mail. We will contact you as soon as possible for more information.
Deep Water Fixed Structures
- South Nemba Jacket Detailed Design
- BaJiaoTing Field: Jacket and Deck Design
- CNOOC PanYu Jacket Integrity Assessment
- Jacket Launch Analyses
Floating Systems Projects
- Deepwater Spar
- Octagonal FPSO
- Bohai Bay BZ3-2
- Malikai TLP FEED
- Chevron Concept selection Study
- CNOOC shallow water Mooring Design Study
- ConocoPhillips/Hanover Corocoro
- AOS/GMI Drilling Semi Deepwater upgrade
- Floating Platform Scantling Sizing toolDevelopment
- Noble Clyde Boudreaux Semi Rig Upgrade FEA
- Ensco 8500 Semi Drilling Rig Global Analysis Model
- CNOOC BoHai S.W field mooring Design
- Noble Danny Akins Node SCF Extraction Analysis
- Hak III Semi Rig Upgrade Local Modeling & Analysis
- Hak V Semi Rig Upgrade Local Node Modeling
- BP Tubular Bell drilling riser analysis
- Roto-Latch Connector FEA for Kizamba B,Rosa & GP
- Murphy Kikeh D.W field FPSO/Spar(TLP) Coupled
- Exmar Opti-EX Production Semi Mooring analysis
- Songa/Exmar Venus Drilling Semi global analysis
- Atlantia Thunder Hawk SCR
Offshore Installation
- Bongkot PPS deck Float Over
- Pontoon Barge Float–Over Installation Study
- North Belut CPP Platform Float – Over Installation Engineering Services
- Pontoon Barge Float–Over Installation of BZ28–2S Field
- COROCORO CPF Floatover
- CHEVIOT Floatover Study
- FRICTION Fender Floatover Study
- Talisman MOPU Stor Dry Installation
- Castor WHP Jacket floatation and upending analysis
- COP Corocoro field WHP
- Chevron Olokola Floatover
- Chevron/EDG Deck Floatover
- Dockwise/ODL W.A Semi-submersible Floatover
- CNOOC BZ34 Topside Floatover Installation